Field · Work orders
Orchard work orders
Every job in the orchard is a work order: spraying, fertilising, mowing, harvest, packing. The order carries the place down to the row, participants with hourly rates, machines and materials from stock. Duration runs while the order is In progress, pauses do not count, and when the order is completed the materials leave stock and the cost is known.
Work order Spraying P2 is scheduled for 10 May 2026 on parcel Sever-P2, against cherry fruit fly.
Two workers at 450 RSD/h, Tractor T-04 at 2,800 RSD/h and 1.2 l of product go on the order.
When the order is completed, the product leaves stock on stock issue SGI-2026-00057.
The order adds up 3.5 h of labour, the machine and materials: 17,630 RSD.
Work order features
- Work order cost
Every work order knows what it cost. The cost is the sum of three parts: participants' labour at the hourly rate from the moment they were assigned, machines at their own rate for the order's duration, and materials at the store's weighted average cost. Pauses do not count towards duration. Spraying parcel P2 took 3.5 hours and cost 17,630 RSD.
- Stock usage from work orders
Materials on a work order are not issued by hand. The order lists the item, quantity and store, and when the order is completed the system creates a stock issue for each store, referencing the order, and takes the stock down at weighted average cost. Orders complete only with enough material on hand, so stock never goes negative.
What a work order does
Job
- A work order is tied to a farm, parcel, block or row, and a parcel's order list also shows the orders on its blocks and rows.
- A work order moves through Pending, In progress, Paused and Completed, and a completed order never goes back into work.
- A work order's duration is the total time spent In progress; pauses do not count.
- A work order is scheduled straight from an inspection recommendation.
Cost
- A work order's cost is the sum of participants' labour, machine hours and materials used.
- Each participant keeps the hourly rate from the moment they were assigned, so a later rate change does not alter past orders.
- A whole team is added to a work order at once: the team leader and every member, each with their own hourly rate.
Stock
- When a work order is completed, the materials used are issued from stock automatically.
- For every store the materials come from, one stock issue is created with a reference to the work order and posted at once.
How the order connects to the rest of the field
Growers' questions
Which jobs can be a work order?
Any job in the orchard or the packhouse. The farm starts with ploughing, sowing, spraying, fertilising, mowing, harvest, transport and packing, and adds its own types.
What if rain stops the job?
The order is paused. Paused time does not count towards duration, so not towards machine or labour hours either, and the order goes back In progress when work resumes.
Who enters the workers' hours?
Nobody, if they worked the whole order. When the order is completed, participants with no hours entered get the order's duration; anyone who worked less is entered by hand.
Show us your harvest
In one call we walk your path from the row to the truck and show it in the system, with your varieties and parcels.