Implementation before the season
Implementation is finished before the first harvest. The orchard is entered down to the row and the rows get labels, the farm inputs store gets its opening stock, workers get cards for the terminal, and the packhouse gets workstations, terminals and label printers. People at intake, sorting and loading learn on their own terminals, and we work the first harvest together with them.
How implementation runs
Parcels, blocks and rows
The farm, parcels, blocks and rows are entered with polygons on the map, from your lists and orchard plans. Every row gets a code, for example Sever-P3-B2-12, and an 80×40 mm label with a barcode, which goes on the row before the harvest.
Crops, varieties and size grades
Crops, varieties, classes and size grades are entered the way the company sells them. The row carries its variety, planting year and number of trees, and the size grade later goes into the pallet LOT. The pallet and crate tare is set once, so the net weight of every harvest is calculated automatically.
Farm inputs store
Plant protection products, fertiliser and other farm inputs are set up as items, with a minimum stock where one is needed. The opening stock is posted as a goods receipt, with the quantity and purchase price of each line, so the very first issue to a work order already has an average cost.
Workers and teams
Permanent and seasonal workers get a code and an 80×50 mm card with their name and a barcode, which they use to sign in to the terminal. Teams are put together with a team leader and members, and the company's contract template is uploaded, so a seasonal worker's contract is generated from the ID card.
Workstations, terminals and printers in the packhouse
Each workstation in the packhouse, from harvest intake and sorting to pallets and loading, gets a terminal and a label printer. Nothing is installed on the terminal: the screen loads from the on-site server. Office users get roles with their own rights.
Training at intake, sorting and loading
Everyone learns their own job on their own terminal: opening a harvest, intake with the gross weight, crates into sorting, a pallet with its label and the scan onto the transport order. The office learns work orders, the farm inputs store and the dispatch documents.
First harvest with support
We work the first harvest alongside your people, from the row to the truck: the first harvest records, the first sorting, the first pallets and the first transport order. Whatever gets stuck is sorted out on the spot, while the harvest is running.
What gets set up in the system
Orchard and store
- The farm is recorded down to the row: farm, parcel, block and row, each with its own polygon on the map.
- Every row gets an 80×40 mm label with the barcode of its code.
- Classes and size grades have a name, a short code and the order in which they are offered for selection.
- Net weight is calculated automatically: gross minus pallet tare and the tare of every crate, using values set for the company.
- A farm inputs goods receipt (SGR) books the quantity and purchase price of each line into the stock of the chosen store.
- Each item carries a minimum stock, and the stock overview flags items on hand whose total stock is below it.
People and packhouse
- The worker code is entered in the web application, which prints an 80×50 mm card with the name and barcode.
- A team has a team leader and members, workers or system users, and a member can have a team hourly rate different from their own.
- The terminal shows only the flows the worker has a role for: harvest intake, receipt into store or dispatch from store.
- A workstation in the web application has a name and code, with one terminal and one printer attached.
- Each terminal is assigned a printer in the web application, and that terminal's labels print on it.
- Nothing is installed on the terminal: its screen loads from the on-site server.
Office
- Office users get their rights through roles, set separately for viewing and for changing each kind of data.
- The office application runs in Serbian and English.
- The terminal runs in Serbian and English, chosen on the sign-in screen.
- The contract is built from a DOCX template: ID card data, shift, hourly rate and engagement period are filled in automatically, and the contract is saved as a PDF on the worker.
Alongside implementation
- Row label
The row code as a barcode, printed for every row before the harvest.
- Farm inputs store
Goods receipts, issues to work orders, average cost and stocktake.
- Barcode sign-in
The worker's barcode card opens the terminal for the whole shift.
- Workstations and terminals
One terminal and one printer for each workstation.
- BMK Agrar
Cherries from the row to the truck, live since June 2026.
- Contact
A walkthrough of one harvest, with your varieties if you like.
Customer questions
Who enters the orchard and the master data?
We do, from your existing lists and orchard plans. After that, daily entry happens at the terminal, by scanning and tapping rather than typing.
When is the best time to start?
Before the season, while the orchard is dormant. The rows need their labels and the packhouse staff their training before the first harvest arrives.
Who supplies the packhouse equipment?
We source terminals, label printers and the on-site server on quotation and set them up as part of implementation, for every workstation in the packhouse.
Which language do people work in?
The terminal runs in Serbian and English, and the language is chosen on the sign-in screen. The office application also runs in Serbian and English.
Show us your harvest
In one call we walk your path from the row to the truck and show it in the system, with your varieties and parcels.